Phase 4- Test

The major objectives of this phase are to verify the system readiness against business features and performance requirements and to ensure system readiness from the business sponsor(s) before the software rollout. Phase four consists of: Website / e-Commerce System Test - Tests will be based upon system definitions created in the design phase (phase two) and are conducted in a lab environment that, at a minimum, simulates production. Production Cutover Support Model - A detailed, step-by-step cutover model will be developed and managed iteratively based upon the transition plan evolved over the last two phases. Configuration Changes - All feedback from the customer's end-user testing will be cycled back into an iterative design and configuration process. Testing Deliverables - These documents summarize phase four and include next phase checkpoint and recommendations.

Contact [email protected] for more information.