RAD Methodology The Rapid Application Development methodology was developed to respond to the need to deliver systems very fast. RAD is a software development process that allows usable systems to be built in as little as 60-90 days, often with some compromises. Project scope, size and circumstances all determine the success of a RAD approach. ----------------------------------------------------------------------------- History of RAD: Barry Boehm (spiral model) Tom Gilb (evolutionary life cycle) Scott Shultz (RIPP, rapid iterative productive prototyping) James Martin (RAD, circa - Cooperative Intelligent Real-Time Control Architecture 1991) James Martin's pillars of RAD 1. Tools 2. People 3. Methodology 4. Management Martin's RAD Life Cycle Systems requirement determination is done in context of a discussion of business problems and business areas. User Design - End users and IS professionals participate in JAD workshops CASE tools are used to support prototyping. Construction - Designer creates code using code generator End user validates screens and other aspects of design. Cutover - New system is delivered to end users. RAD Success Stories Hughes Space and Communications Company, U.S. Navy Fleet Modernization and First National Bank of Chicago. ----------------------------------------------------------------------------- Five key factors: 1. Extensive user involvement 2. Joint Application Design sessions 3. Prototyping 4. Integrated CASE tools 5. Code generators ----------------------------------------------------------------------------- RAD Approach: PROJECT SCOPE Suitable for RAD - Focused scope where the business objectives are well defined and narrow. Unsuitable for RAD - Broad scope where the business objectives are obscure or broad. PROJECT DATA Suitable for RAD - Data for the project already exists (completely or in part). The project largely comprises analysis or reporting of the data. Unsuitable for RAD - Complex and voluminous data must be analyzed, designed and created within the scope of the project. PROJECT DECISIONS Suitable for RAD - Decisions can be made by a small number of people who are available and preferably co-located. Unsuitable for RAD - Many people must be involved in the decisions on the project, the decision makers are not available on a timely basis or they are geographically dispersed. PROJECT TEAM Suitable for RAD - The project team is small (preferably six people or less). Unsuitable for RAD - The project team is large or there are multiple teams whose work needs to be coordinated. PROJECT TECHNICAL ARCHITECTURE Suitable for RAD - The technical architecture is defined and clear and the key technology components are in place and tested. Unsuitable for RAD - The technical architecture is unclear and much of the technology will be used for the first time within the project. PROJECT TECHNICAL REQUIREMENTS Suitable for RAD - Technical requirements (response times, throughput, database sizes, etc.) are reasonable and well within the capabilities of the technology being used. In fact targeted performance should be less than 70% of the published limits of the technologies. Unsuitable for RAD - Technical requirements are tight for the equipment to be used. Rapid means Fast The RAD method has a task list and a work breakdown structure that is designed for speed. However the major difference in RAD is a set of management techniques that are optimized for speed. Among the most important are: - Prototyping - an approach based on creating a demonstrable result as early as possible and refining that result. The refinement is based on feedback from the business, the eventual users of the system. Prototyping requires an open approach to development, it also requires an emphasis on relationship management and change management. There are dangers involved in starting prototype development too early and in starting it too late. - Iteration - is a commitment to incremental development based on refinement. Prototyping and iteration go hand in hand. - Timeboxing - is a management technique that focuses attention on delivery above all else. Under a timebox scope can change but delivery cannot. ----------------------------------------------------------------------------- RONSYSTEMS RAD Process Template - Stage PMP - Plan Project - Stage PMA - Activate Project - Stage PMC - Control Project - Stage RAP - Requirements Planning - Stage RAU - User Design - Stage RAC - Rapid Construction - Stage TRN - Transition - Stage PME - End Project Contact us at [email protected] to learn more about RONSYSTEMS RAD services.
|